Factory production control
EN 1090 · EXC4 · 13/04/2027

Site welding is our rarest asset. It is certified to EN 1090-2 EXC4 and ISO 3834-2, coordinated by an IWT and traced weld by weld.
An IWT provides welding coordination. Approved WPS and WPQR, qualified welders and an up-to-date register.
Every weld is linked to its welder, procedure and heat number, through dedicated welding software.
Geometric checks and laser alignment to manufacturer tolerances.
Project-specific NDT plan, performed by certified operators, with a handover dossier issued to the client.
Work method statements (WMS) and inspection and test plans (ITP) structure execution. Dimensional, alignment, torque, coating and NDT checks are recorded. Nonconformities follow documented analysis, correction, corrective action, effectiveness review and closure. Lessons learned inform standards and training.
Certificates are supplied with every bid.
Share your specifications, equipment lists or drawings with our team.